strip_ips_impeller.png

NEWS

CONTENT

CONTACT

Get in touch with our experts directly to learn more

LARGE SHUTDOWN 2020!

November 2020

We are excited to announce a recently completed large shutdown. During what was a very long and challenging turnaround our customer was very positive and impressed by our team, delivering on time and below budget given the challenges caused by COVID-19.

Major Overhaul of 2x Steam Turbines

Major overhaul of two steam turbines. Both turbines were brought to serviceable condition with commisioning data revealing nominal temperatures and pressures

Inspection of an Allis Chalmers V-307 Compressor

During inspection, repairs were made to improve seal clearances. As a result, these changes greatly improved the efficiency of this machine.

Bearing Upgrade of an Allis Chalmers V-1604 Compressor

Transitioning from a journal bearing to tilting pad bearings showed significant temperature reduction and improved oil spread distribution

New Diaphragms for an Allis Chalmers V-703 Compressor

New diapragms are installed with noticeable improvements in efficiency and modifications to bearing housings for adjusting the position of the rotor

Design & Manufacture of Turbine/Motor Driven Packages

Delivery of two machine train packages from design through to manufacture. Designed in accordance to API standards and paint specification outlined by our customer

CALL US

Ph: (02) 9981 2000

VISIT US - HEADQUARTERS

72 Somersby Road, Somersby NSW

Australia

OPENING HOURS

Mon - Fri: 7am - 5:00pm